FIGURE 9.3 - STEAM GENERATOR/BOILER CALIBRATION PROCEDURE
FIGURE 9.4 - SOLENOID VALVE
40 41
9.0 – REFERENCE BLOCKS
(continued)
Applies to STATIM 2000 and 5000
STEP #1 - Turn the autoclave off and remove the power
cord from the AC outlet. Remove the cover, refill the reser-
voir (with distilled water) and install the RPI Extension Test
Cable (RPI Part #SCT026). See page 4, Figure 2.1.
STEP #2 - Connect your RPI Start Switch (RPI Part
#SCS021) to the pins marked W1 on the main PC board.
See pages 46 and 47, Figure 9.8 - Electrical Diagram.
STEP #3 - Push and slide the button on the Start
Switch to lock the switch in the “ON” position.
STEP #4 - Plug in the power cord and turn the power
switch to "ON".
STEP #5 - The LCD display should appear similar to
Figure 1 below.
STEP #6 - Insert cassette.
STEP #7 - Begin calibration procedure by holding down
the “unwrapped” button and simultaneously pressing
the start button. The display should appear similar to
Figure 2 below.
STEP #8 - The calibration continues and it takes dif-
ferent paths depending on whether it is a new style or
old style main PC board.
Old Style: Calibration will take ~ 5 min’s. A long beep
will be heard upon completion. The “00” on the display
will change similar to Figure 3 below.
Now press the “STOP” button allowing the system to
vent. Display will read “PRESS STOP TO RESET” when
the venting is complete. Pressing the “STOP” button
again will reset the autoclave and the display will now
read ‘SELECT A CYCLE’ (SELECT A PROGRAM). Cali-
bration is complete and the autoclave is ready for nor-
mal use.
New Style: When cycle reaches “STERILIZATION
PHASE” unit will beep twice. Autoclave will automati-
cally vent after 3-1/2 minutes. The boiler calibration is
now complete and the LCD display should change sim-
ilar to Figure 3 below.
After venting, press the “STOP” button to end calibra-
tion cycle. Autoclave is now ready for normal use.
FIGURE 1 FIGURE 2 FIGURE 3
F9> CALIBRATION <C8
+32.00˚C 65.00˚C
9.0 – REFERENCE BLOCKS
(continued)
SERVICE TIP
Avoid crushing the flute/bonnet
(which would prevent the plunger
from moving up and down freely)
by using a Spanner Nut (RPI Part
#RPT364) or Spanner Wrench (RPI
Part #RPT501).
Inspect and clean plunger rubber
seat, replace if necessary. Uneven
wear could indicate a problem.
Lubricate the plunger (metal body
only) with a drop of 3-IN-ONE® oil.
This can also help reduce valve
noise.
• Inspect and clean valve body orifice
and ports, looking for damage and
debris.
Check that the coil has been rein-
stalled in the proper orientation.
T
I
A
O
L
e
s
C
v
i
e
h
d
5
4
5
OLD STYLE
25.5 C8 24.1 F9
1.4
NEW STYLE
F6> CALIBRATION <C8
+2.00˚C 135.00˚C
OLD STYLE
145.5 F3* 135.9 F9
9.6
NEW STYLE
00> CALIBRATION* <C8
+32.00˚C 65.00˚C
OLD STYLE
25.5 00* 24.1 F9
1.4
NEW STYLE
Old Style: Upper Left corner will
change to "00" and an asterisk
will appear after CALIBRATION*
New Style: Unit will beep 3 times.
C8 will change to 00*
Nut
Coil
(RPI Part #SCC005)
Coil Bracket
Flute/Bonnet
Spring
Shading Disk
Plunger
O-ring
Valve Body
Orifice
Push-in Elbow Fitting
(RPI Part #RPF362
Port #2
Spanner Nut
(RPI Part #RPT364)
Screw (#8-32 x 1/2 -SEMS)
(RPI Part #RPH817)
2 places
Solenoid Plunger Kit
(RPI Part #SCK003)
Copper Tubing Kit
(RPI Part #SCK048) &
(RPI Part #SCK049)
Thread Locker
(RPI Part #RPA369)
Male Connector
(RPI Part #RPF227)
Port #1
Mounting Bracket
(not included)
Solenoid Valve Electrical Data
1) Coil Resistance: 3.25- 3.96 Meg. Ω
NOTE: This Coil is a FWR Coil and the
resistance must be checked on both
leads. Then reverse the leads and
recheck. The resistance must be the
same in both directions or the coil is
bad.
2)
Coil AC Line Voltage: 120V/60 Hz, 9W.
While in the Warming Stage, Line
Voltage should be present at termi-
nals J1-7 and J1-8 on main PC
board. If not, main PC board is bad.